Project Team Darren Campbell, Neil Waldron Consultants Builder:  To be confirmed Engineer:  Cardno Landscaping:  Secret Gardens Interior design:  KG Designs Site details Location:  Lane Cove Site area: 780.5m2 Type:  Alterations and additions Project details Status:  Construction Design, documentation:  12 months Construction:  Not commenced...
Project Team Darren Campbell, Neil Waldron Consultants Builder: Scarborough Building Engineering: Â Goral (Structure) Site details Location: Â Naremburn Site area: 322.5m2 Type: Â Alterations and additions Project details Status: Â Completed Design, documentation: Â 12 months Construction: Â 6 months Scope: Internal alterations to the ground floor o Addition of an ensuite and walk in robe to the main bedroom (requiring removal of the brick fireplace and chimney) o Relocation of laundry and bathroom o The new stairs to lower floor level o Replanning at the rear to include a living space and kitchen Addition to the rear of the building including o extension of the...
Project Team Darren Campbell, Neil Waldron Consultants Builder:  eDeck Engineering:  Partridge Partners (structural), StormCivil (stormwater) Site details Location:  Naremburn Site area: 641m2 Type:  Alterations and additions Project details Status:  Built Design, documentation:  12 months Construction:  10 months ...
Project Team Darren Campbell Consultants Builder: Â To be confirmed Engineer: Â To be confirmed Site details Location: Â Naremburn Site area: 303.5m2 Type: Â Alterations and additions Project details Status: Â Documentation Design, documentation: Â Current Construction: Â Not commenced...
Project Team Darren Campbell Consultants Builder: Â Nexgen Constructions Engineer: Â Jack Davies (structural), StormCivil (stormwater) Landscaping: Â Kate Mitchell Design Town planning: Â Urbanesque Planning Site details Location: Â Roseville Site area: 762.5m2 Type: Â Alterations and additions Project details Status: Â Built Design, documentation: Â 6 months Construction: Â 10 months Details:Â Alterations and additions to an inter-war period two-storey brick bungalow in a Kur-ring-gai Council Heritage Conservation Area...
Project Team Darren Campbell Site details Location: Â Roseville Type: Â Alterations and additions Project details Status: Â Built Design, documentation: Â 6 months Construction: Â 10 months Details:Â Alterations and additions to an inter-war period two-storey brick bungalow in a Kur-ring-gai Council Heritage Conservation Area...
Project Team Darren Campbell Consultants Builder: Â Owner Engineer: Â Partridge Partners (structural), StormCivil (stormwater) Site details Location: Â Naremburn Site area: 303m2 Type: Â Alterations and additions Project details Status: Â Built Design, documentation: Â 6 months Construction: Â 10 months Details:Â Alterations and additions to a single storey brick and tiled roof cottage in Naremburn located in the Naremburn Heritage Conservation Area....
Project Team Darren Campbell Consultants Engineer:  StormCivil (stormwater) Site details Location:  Naremburn Site area: 303.5m2 Type:  Alterations and additions Project details Status:  Development Application approved 2013 Design, documentation:  6 months Details: Alterations and additions to single storey brick bungalow in a Willoughby City Council Heritage Conservation Area...
Project Team Darren Campbell Site details Location: Â Naremburn Site area: 556m2 Type: Â Alterations and additions Project details Status: Â Built Design, documentation: Â 6 months Construction: Â 10 months Details:Â Alterations and additions to a single-storey brick bungalow...