Terraced house is located in the Sydney suburb of Northbridge, on the northern side of the peninsula with north-westerly views over Sailors Bay and Mowbray Point. Terraced house was designed as the city home for a farming family from Western NSW. Familiar with open…
...Project Team Darren Campbell Consultants Builder: Â Carty Property Engineer: Â Residential Engineering Landscaping: Â iScape Landscape Architecture Image: CSR Hebel Site details Location: Â St Ives Site area: 1431m2 Type: Â New houses Project details Status: Â DA approved Design, documentation: Â Completed Construction: Â Under construction ...
Project Team Darren Campbell, Joseph Santelli Consultants Builder:  Glen Terry Building Engineering:  Neilly Davies Stormwater:  StormCivil Engineering Solutions Site details Location:  Naremburn Site area:  366.7m2 Type:  Alterations and additions Project details Status:  Construction Design, documentation:  6 months Construction:  8 months...
Project Team Darren Campbell, Tom Velich Consultants Builder: Â Nexgen Constructions Engineer: Â Philip Henry (structural), StormCivil (stormwater) Landscaping: Â Peter Fudge Gardens Town planning: Â Urbanesque Planning Site details Location: Â Roseville Site area: 913.6m2 Type: Â Alterations and additions Project details Status: Â Construction Design, documentation: Â 9 months Construction: Â 12 months Details:Â Alterations and additions to an inter-war period two-storey brick bungalow in a Kur-ring-gai Council Heritage Conservation Area...
Project Team Darren Campbell, Neil Waldron Consultants Builder:  Newmark Constructions Stormwater:  StormCivil Engineering Solutions Photography:  Studio 33  http://www.studio33.com.au/ Site details Location:  Gordon Site area:  682.9m2 Type:  New houses Project details Status:  Completed Design, documentation:  12 months Construction:  10 months...
Project Team Darren Campbell, Neil Waldron Consultants Builder:  To be confirmed Engineer:  Cardno Landscaping:  Secret Gardens Interior design:  KG Designs Site details Location:  Lane Cove Site area: 780.5m2 Type:  Alterations and additions Project details Status:  Construction Design, documentation:  12 months Construction:  Not commenced...
Project Team Darren Campbell, Neil Waldron Consultants Builder: Scarborough Building Engineering: Â Goral (Structure) Site details Location: Â Naremburn Site area: 322.5m2 Type: Â Alterations and additions Project details Status: Â Completed Design, documentation: Â 12 months Construction: Â 6 months Scope: Internal alterations to the ground floor o Addition of an ensuite and walk in robe to the main bedroom (requiring removal of the brick fireplace and chimney) o Relocation of laundry and bathroom o The new stairs to lower floor level o Replanning at the rear to include a living space and kitchen Addition to the rear of the building including o extension of the...
Project Team Darren Campbell, Neil Waldron Consultants Builder:  eDeck Engineering:  Partridge Partners (structural), StormCivil (stormwater) Site details Location:  Naremburn Site area: 641m2 Type:  Alterations and additions Project details Status:  Built Design, documentation:  12 months Construction:  10 months ...