Terraced house is located in the Sydney suburb of Northbridge, on the northern side of the peninsula with north-westerly views over Sailors Bay and Mowbray Point. Terraced house was designed as the city home for a farming family from Western NSW. Familiar with open…
...Project Team Darren Campbell Consultants Builder: Carty Property Engineer: Residential Engineering Landscaping: iScape Landscape Architecture Image: CSR Hebel Site details Location: St Ives Site area: 1431m2 Type: New houses Project details Status: DA approved Design, documentation: Completed Construction: Under construction ...
Project Team Darren Campbell, Joseph Santelli Consultants Builder: Glen Terry Building Engineering: Neilly Davies Stormwater: StormCivil Engineering Solutions Site details Location: Naremburn Site area: 366.7m2 Type: Alterations and additions Project details Status: Construction Design, documentation: 6 months Construction: 8 months...
Project Team Darren Campbell, Tom Velich Consultants Builder: Nexgen Constructions Engineer: Philip Henry (structural), StormCivil (stormwater) Landscaping: Peter Fudge Gardens Town planning: Urbanesque Planning Site details Location: Roseville Site area: 913.6m2 Type: Alterations and additions Project details Status: Construction Design, documentation: 9 months Construction: 12 months Details: Alterations and additions to an inter-war period two-storey brick bungalow in a Kur-ring-gai Council Heritage Conservation Area...
Project Team Darren Campbell, Neil Waldron Consultants Builder: Newmark Constructions Stormwater: StormCivil Engineering Solutions Photography: Studio 33 http://www.studio33.com.au/ Site details Location: Gordon Site area: 682.9m2 Type: New houses Project details Status: Completed Design, documentation: 12 months Construction: 10 months...
Project Team Darren Campbell, Neil Waldron Consultants Builder: To be confirmed Engineer: Cardno Landscaping: Secret Gardens Interior design: KG Designs Site details Location: Lane Cove Site area: 780.5m2 Type: Alterations and additions Project details Status: Construction Design, documentation: 12 months Construction: Not commenced...
Project Team Darren Campbell, Neil Waldron Consultants Builder: Scarborough Building Engineering: Goral (Structure) Site details Location: Naremburn Site area: 322.5m2 Type: Alterations and additions Project details Status: Completed Design, documentation: 12 months Construction: 6 months Scope: Internal alterations to the ground floor o Addition of an ensuite and walk in robe to the main bedroom (requiring removal of the brick fireplace and chimney) o Relocation of laundry and bathroom o The new stairs to lower floor level o Replanning at the rear to include a living space and kitchen Addition to the rear of the building including o extension of the...
Project Team Darren Campbell, Neil Waldron Consultants Builder: eDeck Engineering: Partridge Partners (structural), StormCivil (stormwater) Site details Location: Naremburn Site area: 641m2 Type: Alterations and additions Project details Status: Built Design, documentation: 12 months Construction: 10 months ...