Terraced house is located in the Sydney suburb of Northbridge, on the northern side of the peninsula with north-westerly views over Sailors Bay and Mowbray Point. Terraced house was designed as the city home for a farming family from Western NSW. Familiar with open…
...Project Team Darren Campbell Consultants Builder: Carty Homes Engineer: Residential Engineering Landscaping: iScape Landscape Architecture Image: CSR Hebel Site details Location: St Ives Site area: 1431m2 Type: New houses Project details Status: DA approved Design, documentation: 2015 Construction: Completed 2016 St Ives house uses a solid panel product from Hebel as the main structural material. The Hebel walls and floors offer advantages in reducing construction time leading to cost savings and thermal efficiency through its high insulation value....
Project Team Darren Campbell, Joseph Santelli Consultants Builder:  Glen Terry Building Engineering:  Neilly Davies Stormwater:  StormCivil Engineering Solutions Site details Location:  Naremburn Site area:  366.7m2 Type:  Alterations and additions Project details Status:  Construction Design, documentation:  6 months Construction:  8 months...
Project Team Darren Campbell Consultants Builder: Â Nexgen Constructions Engineer: Â Philip Henry (structural), StormCivil (stormwater) Landscaping: Â Peter Fudge Gardens Town planning: Â Urbanesque Planning Site details Location: Â Roseville Site area: 913.6m2 Type: Â Alterations and additions Project details Status: Â Completed 2017 Design, documentation: Â 9 months Construction: Â 12 months Details:Â Alterations and additions to an inter-war period two-storey brick bungalow in a Kur-ring-gai Council Heritage Conservation Area...
Project Team Darren Campbell, Neil Waldron Consultants Builder:  Newmark Constructions Stormwater:  StormCivil Engineering Solutions Photography:  Studio 33  http://www.studio33.com.au/ Site details Location:  Gordon Site area:  682.9m2 Type:  New houses Project details Status:  Completed Design, documentation:  12 months Construction:  10 months...
Project Team Darren Campbell, Neil Waldron Consultants Builder:  To be confirmed Engineer:  Cardno Landscaping:  Secret Gardens Interior design:  KG Designs Site details Location:  Lane Cove Site area: 780.5m2 Type:  Alterations and additions Project details Status:  Construction Design, documentation:  12 months Construction:  Not commenced...
Project Team Darren Campbell, Neil Waldron Consultants Builder: Scarborough Building Engineering: Â Goral (Structure) Site details Location: Â Naremburn Site area: 322.5m2 Type: Â Alterations and additions Project details Status: Â Completed Design, documentation: Â 12 months Construction: Â 6 months Scope: Internal alterations to the ground floor o Addition of an ensuite and walk in robe to the main bedroom (requiring removal of the brick fireplace and chimney) o Relocation of laundry and bathroom o The new stairs to lower floor level o Replanning at the rear to include a living space and kitchen Addition to the rear of the building including o extension of the...
Project Team Darren Campbell, Neil Waldron Consultants Builder:  eDeck Engineering:  Partridge Partners (structural), StormCivil (stormwater) Site details Location:  Naremburn Site area: 641m2 Type:  Alterations and additions Project details Status:  Built Design, documentation:  12 months Construction:  10 months ...